This presentation seeks to explain the TOC solution of critical chain project management (CCPM) for use in modern software engineering. Key learning points include: 1. How to use drum buffer rope (DBR) with software engineering; 2. How to use throughput accounting (TA) with software engineering; 3. Understanding useful variation in software engineering; 4. Provide a TOC enabled maturity model for software organizations; 5. Identifying what’s fundamentally wrong with the SEI CMMI and SW-CMM; 6. The integration points of a TOC software solution with six sigma, Deming, and Toyota Production System (TPS) principles and lean thinking. Benefits to attendees: 1. Benefits of applying DBR, CCPM and TA to technology development; 2. Contrast of the TOC approach with traditional approaches; 2. Benefits of using lean cumulative flow diagrams for the DBR solution.
|
|
Scooped by
Philip Marris
onto Critical Chain Project Management June 22, 11:16 AM
|
Your new post is loading...