7 Project Recovery Techniques when you feel like the project is getting out of hands -

7 Project Recovery Techniques when you feel like the project is getting out of hands - | Devops for Growth | Scoop.it
Here are 7 project recovery techniques which can bring back a project that is about to go haywire.
Mickael Ruau's insight:

 

3) Shoot down the schedule

There are two ways to do something. One is hard work which translates to overtime in our case. The second is to work smart. Working smartly means eliminating the unnecessary steps and choosing the critical path to get the thing done. An article by Microsoft shows how to select the most critical parts and make your schedule flexible.

4) Fast Track Tasks

The idea here is what we call partial overlapping. With this approach, you find that tasks that could be started right before their predecessors are completed effectively. Which means you can pick and choose to complete tasks which are not dependent on any other tasks first.

5) Scope Change, not anymore

As mentioned earlier in Matt Alderton’s article, defining the scope of the project is the tricky part. If you don’t determine the scope right from the start, constant changes in the scope will only serve to confuse the workers and creep them out. Try not to change the scope every now and then.

6) Slackening the Horizon of the project

Perhaps the initial horizon of the project was too expansive and the allocated time was not enough to complete the project, which resulted in slackening the project and killing its core. It is wise to keep the horizon of the project as wide as you can manage.

No comment yet.
Scooped by Mickael Ruau
January 12, 2022 1:06 AM
Scoop.it!

The Forgotten Layer of the Test Automation Pyramid

The Forgotten Layer of the Test Automation Pyramid | Devops for Growth | Scoop.it
Even before the ascendancy of agile methodologies like Scrum, we knew we should automate our tests. But we didn’t. Automated tests were considered expensive to write and were often written months, or in some cases years, after a feature had been programmed. One reason teams found it difficult to write tests sooner was because they were automating at the wrong level. An effective test automation strategy calls for automating tests at three different levels, as shown in the figure below, which depicts the test automation pyramid.
No comment yet.
Scooped by Mickael Ruau
January 11, 2022 2:54 AM
Scoop.it!

Comment construire une roadmap produit ?

Comment construire une roadmap produit ? | Devops for Growth | Scoop.it
Une tentative de réponse à ce casse-tête de product manager ! Construire une roadmap, bien prioriser les projets et bien la communiquer.
No comment yet.
Scooped by Mickael Ruau
January 11, 2022 1:41 AM
Scoop.it!

Ask a PM: How to rescue a project in trouble. Six steps to follow | Psoda

Ask a PM: How to rescue a project in trouble. Six steps to follow | Psoda | Devops for Growth | Scoop.it
Rescuing a project in trouble isn't for the faint hearted. Read on for a six step process you can follow if you need to rescue a troubled project
Mickael Ruau's insight:

 

Current state assessment

Before you even start trying to plan the recovery you need to know what the current status of the project is. The best way to do this is to audit the project. If you can, it’s worth getting an expert in to do this bit of work as they’ll know exactly what to look for. If you can’t, here’s a process you can use:

1. Document review

The document review will give you a lot of critical information. You should be able to understand exactly what the project was supposed to deliver, when and how it was to deliver it. Documents you need to review include:

  • Project requirements specifications
  • Project charter
  • Contracts
  • Project plans
  • Work packages
  • Budgets
  • Resource plans
  • Quality plans
  • Metrics
  • Stage gate reviews
  • Status reports
  • Change requests

When you’re reviewing the documents there are a number of red flags you should be looking for:

  • Vague or incomplete requirements. These set the project up to fail. Poor requirements mean that everything the project does is built on sand and it will likely be subject to a lot
    of changes throughout the lifecycle.
  • Unrealistic benefits in the charter. This indicates that the project manager and sponsor don’t have a handle on what it is they want to achieve with the project
  • Too tight or too loose contracts. Both scenarios are bad news. Too tight, means there’s less wiggle room when needed and too loose means anything goes.
  • No work packages or work packages that are light on details. As these are the key documents for the people actually doing the work, they won’t deliver what you want them to deliver
    if they are short on details.
  • Lots of change requests. This is one of my big red flags. This tells me that either the project hasn’t been planned properly in the first instance or that the tolerances are too
    low.
  • The names of people assigned to the project keep changing. Again, this is a big red flag to me as this can indicate serious morale problems. It can also be a sign that the business
    has lost confidence in project.
  • The Gantt chart is updated too often or not often enough. By looking at the updates on the Gantt chart, you can see if the project manager has a handle on what’s going on or has
    let things slip. Personally, I find if it’s being updated more frequently than once a week the project manager is too into micromanaging. If it’s updated less than fortnightly,
    then the project manager has lost control.
  • The number of versions the documents have gone through. This might seem a strange one but if there are too few or too many revisions it can indicate a disengaged steering
    committee, or an overzealous one. Both of which are bad news.
  • Project status reports have no bad news. If the project status reports are consistently Pollyanna in their outlook, this tells you that you either have a project team in denial or
    one which doesn’t care. Not good.

Once you’ve finished the document review you should have a good idea where the project’s at. It’s time to move on to the next phase of the audit.

2. Interviews with the key stakeholders

Never underestimate the power of a face-to-face interview. This is often the point where you’ll get to the real root cause of the project’s problems.
You should aim to sit down with the following people:

  • The client(s)
  • Project team
  • Project steering committee
  • Sponsor
  • PMO

You’re looking to get insights into why those parties think the project is in trouble and if they have any ideas on how to get the project back on track. This can be a useful source of information you may not otherwise get access to.
Questions I tend to ask are:

  • Why do you think the project is failing?
  • How do you think it can get back on track?
  • Should it be revived?

During the interviews, make sure it’s clear that anything said is confidential and that you’re looking for a full and frank discussion.

No comment yet.
Scooped by Mickael Ruau
January 11, 2022 12:57 AM
Scoop.it!

Sauvetage d’un Projet : Le Diagnostic –

Sauvetage d’un Projet : Le Diagnostic – | Devops for Growth | Scoop.it
Voici un nouvel article qui mérite attention si l'on se voit chargé de remettre un projet sur les rails. Article original en anglais de Joanne Wortman: http://www.pmhut.com/rescuing-a-project-diagnosis Joanne nous dit: J'ai déjà parlé de triage de portefeuille de projet. Le résultat de l'effort de triage est d'identifier ces projets le plus dans le besoin d'intervention…
No comment yet.
Scooped by Mickael Ruau
January 10, 2022 11:06 AM
Scoop.it!

4 Tips for Getting Your Project Back on Track

4 Tips for Getting Your Project Back on Track | Devops for Growth | Scoop.it
The project will run the risk of missing the deadline. Project manager will have to take drastic measures in order to get the project back on track.
Mickael Ruau's insight:

 

2. Stop scope creep

Scope creep is one of the biggest and most common causes of project delays. It causes a radical reassignment of priorities and resources, which can derail momentum and hamper focus. The project team also has to waste time backtracking and review finished work to ensure that nothing is adversely affected by the new scope.

To avoid this, project managers will have to go back to the client/stakeholders and refuse any more unnecessary changes to the scope. Or, barring that, the client will have to sign off on a new timeline that accounts for the scope creep and be billed accordingly.

3. Parallel production

When a project team is pressed for time, it may be a good idea to start working on things in parallel. This is roughly equivalent to how chefs in a kitchen work: one chef chops up the vegetables while the other prepares the beef roast. The dish is then finished in half the time than if they had done it sequentially. Note that this tip only works if the tasks you’re working on aren’t dependent on each other (like cooking seasoning the meat before roasting it, for example).

No comment yet.
Scooped by Mickael Ruau
January 10, 2022 4:48 AM
Scoop.it!

Lean LaunchPad

Lean LaunchPad | Devops for Growth | Scoop.it
The case method and business plans are the antithesis of how entrepreneurs create startups
The case method assumes that students learn when they participate in a discussion of a situation they may someday face as a decision-maker. But the case method is the antithesis of how entrepreneurs create a startup. Cases teaches pattern recognition tools for static patterns—and has limited value as a tool for teaching entrepreneurship. Analyzing a case in the classroom, removed from the realities of a new venture, adds little to an entrepreneur’s preparation for the chaos, uncertainty, and conflicting customer responses that all entrepreneurs face.

Business plans presume that building a startup is a series of predictable steps requiring execution of a plan which assumes a series of known facts: known customers, known features, known pricing, known distribution channel. As a serial entrepreneur turned educator, this didn’t make sense to me. In a new venture none of these things are truly known. The reality is that most business plans don’t survive first contact with customers.

Neither cases nor business plans replicate the actual startup experience. Cases and plans are useful for teaching managers of process, not founders. Founders of startups (and new ventures inside existing companies) are searching for product/market fit and a repeatable and scalable business model. Searching, unlike execution, is not a predictable pattern. An entrepreneur must start with the belief that all their assumptions are simply hypotheses that will undoubtedly be challenged by what they learn from customers.

Yet up until 10 years ago, schools were still teaching entrepreneurs how to build startups on the premise that they were simply smaller versions of large companies. Entrepreneurial education was trapped in the 20th century.
No comment yet.
Scooped by Mickael Ruau
January 10, 2022 1:41 AM
Scoop.it!

When to kill (and when to recover) a failed project

When to kill (and when to recover) a failed project | Devops for Growth | Scoop.it
Is project recovery possible? 5 key questions

1. Have there been any internal or external changes that could be hurting the project?

Recent business, market or technology developments may be adversely affecting the project's framework and goals. The plan may need to be redesigned to accommodate these changes.

2. Should we reduce our goals to a more realistic level?

Initial overly optimistic projections may have to be scaled back to reflect real world conditions.

3. Is our current project team working together as effectively as possible?

Team dissention may be pulling the project down. Now is the time to either resolve these problems or to shake up the team by adding and/or losing members.

4. Why are we falling behind schedule and is there anything we can do about it?

A period of introspection and revised planning can help get a lagging project back on track.

5. Who can we call in to help us?

A project outsider might be able to detect problems that team members are too involved to see.
No comment yet.
Scooped by Mickael Ruau
January 10, 2022 1:04 AM
Scoop.it!

Why Projects Fail and How to Recover

Why Projects Fail and How to Recover | Devops for Growth | Scoop.it

Turning Around a Failing Project When the Problem Is Resources

Projects often fail because they run out of money or the people working on the project simply can’t get everything done. Fixing problems with resources can help get a project back on track.

Getting the team involved from the beginning of a project reboot is a way to rebuild everyone’s confidence and regain focus. This is also the time to discuss any problems the team had up until this point in order to determine how to prevent the same situation from happening in the future. Sometimes, building up the team requires learning how to argue more efficiently — that is, homing in on project details rather than personalities.

“It’s really important to praise in public and criticize in private. You want to make sure there is an atmosphere of openness,” Hofmeyer says. Then, in a one-on-one context, you should address a team member’s personal issues, because they don’t just go away, Hofmeyer adds.

Creating a realistic and accurate schedule is essential. An eight-hour workday translates into only about six hours of actual work time, so keep that in mind when creating new timelines and schedules. Overestimating the amount of time available in a workday might be what got the project in trouble initially.

Hofmeyer says that on any project, 20 percent of the people do about 80 percent of the work, so he suggests that when re-tasking a project, you should make sure the work is more balanced.

Also, be aware of the other projects that each team member is working on. People may be working on multiple projects with similar deadlines, which could impact their availability. This factor is particularly important when trying to turn around a failing or overdue project. A project may have been unsuccessful precisely because team members were overcommitted and had to fulfill other responsibilities.

As a way of controlling team dynamics, make sure you clearly define any new roles and responsibilities. The project manager sets the tone for communication and needs to be clear in terms of delivery and expectations.

If communication breakdowns were part of why the project initially failed, centralizing all project communication in one visible location can keep team members informed. Everyone on the team should have access to this location. Set parameters for communication. Is email the best? Should one reply directly to the individual who sends an email or reply to the entire team?

Follow up on all methods of communication. Sometimes, people miss emails or accidentally delete them. Don’t assume people will remember something someone told them previously. Follow up.

“When you kick off a project, you should tell your team what your communication plan will be,” Balaban suggests. You should also include a plan for escalation, should a problem arise. “Everyone should know ahead of time how the plan will work,” she continues.

In kickoff meetings, Balaban says she always asks her team one question: “Is there anything I haven’t covered that I should?” Doing so fosters openness and demonstrates from the outset that you’re willing to listen and learn from the team.

Dealing with funders and key stakeholders is a separate issue. “Find out your stakeholders’ preferred form of communication,” Balaban says. She uses the example of one former boss who just wanted her to come into his office and informally tell him what was happening with the project she was running. Another wanted formal presentations with handouts and slides.

If the appropriate people were not part of the initial team, the recovery phase is the time to make those personnel changes. “If you receive the B or C team, you need to keep communicating with the leadership, telling them that the team is not delivering,” Balaban recommends.
No comment yet.
Scooped by Mickael Ruau
January 9, 2022 11:29 AM
Scoop.it!

The Flow Guide™ - The Definitive Guide to The Flow System™

The Flow Guide™ - The Definitive Guide to The Flow System™ | Devops for Growth | Scoop.it
The Flow System is a built on a foundation of The Toyota Production System, known as TPS & LEAN, plus a triple helix structure, the DNA of Organizations.
No comment yet.
Scooped by Mickael Ruau
January 9, 2022 10:23 AM
Scoop.it!

How London’s Silicon Roundabout dream turned into a nightmare

How London’s Silicon Roundabout dream turned into a nightmare | Devops for Growth | Scoop.it

Silva travelled to Silicon Valley – with then digital secretary Jeremy Hunt in tow – for a meeting with then Google CEO Eric Schmidt. Silva did not even have a name for the cluster yet, but somehow hoped that Schmidt would be won over by the vision, and throw Google’s weight and money behind it. “I said we were going to do something really big to get behind this digital cluster emerging in East London. ‘It's gonna be great, we would love for you to be involved’,” Silva recalls. Schmidt was curt: he had heard similar spiels before; he was not going to send Google folks to a business park in the middle of nowhere. Silva then rattled off the bountiful attractions of Shoreditch – its independent art galleries, its cafes, its clubs. “That cultural life of East London was what persuaded him,” Silva says. Schmidt initially proposed to buy the whole Olympic Park, but Silva convinced him to do something slightly less dramatic – open a Google-run space near the roundabout. The result was the Google Campus: a seven-storey coworking space – including free coworking in the building’s basement cafe – and event venue that opened on Bonhill Street in 2012.

The jigsaw was complete. Before, aspiring startuppers getting off at Old Street station would bemusedly peer around for a portal to the famed Silicon Roundabout; now they would head to the Campus cafe, grab a peanut butter brownie, and type on their laptops for hours, surrounded by tens of other people doing exactly the same. The government had pointed at the roundabout, and Google had made it a cluster.

Over the next few years, the neighbourhood would be set alight with ferment and the sacred fire of innovation.

No comment yet.
Scooped by Mickael Ruau
January 8, 2022 5:01 AM
Scoop.it!

The Practical Test Pyramid · Sébastien Allemand Blog



La pyramide de test de Mike Cohn est sans doute l’approche le plus simple pour comprendre les différentes couches de tests et leurs proportions (ratio LoC). Si vous avez besoin de développer une application robuste et stable qui doit le rester dans le temps, investir dans une stratégie de tests est intéressante pour vous.

Cette stratégie s’adapte progressivement à vos besoins et aux spécificités de votre application. La pyramide des tests, se base sur les techniques les plus accessible pour, au fil du temps, intégrer des pratiques de plus en plus complexes à mettre en oeuvre.
No comment yet.
Scooped by Mickael Ruau
January 8, 2022 2:43 AM
Scoop.it!

Unravelling the design process of business models from linear to circular: An empirical investigation - Franzò - 2021 - Business Strategy and the Environment

Unravelling the design process of business models from linear to circular: An empirical investigation - Franzò - 2021 - Business Strategy and the Environment | Devops for Growth | Scoop.it
Abstract

In the last years, circular economy has represented one of the most-debated topics in management research. Although the understanding of this industrial paradigm has significantly improved over the last decade, a number of important research questions still remain unanswered. Among them, the design process of business model through which established firms evolve from being linear to circular deserves further investigation. Existing research still falls short to investigate how companies design the dimensions of value creation, value transfer, and value capture of their business models to launch circular products into the market. By leveraging a multiple case study analysis of four companies in the paper and beverage industries that have launched six circular products, the paper examines the process that these companies have followed to face the transition toward a circular business model. The paper contributes to the research field in the intersection between new product development and circular business models, by showing that the process toward a circular business model occurs along three major phases, that is, idea generation, product development, and commercialization. In each phase, companies implement peculiar managerial practices for launching circular products into the market, which typically address all the dimensions of the business model and follows a recurrent path over time.
No comment yet.
Scooped by Mickael Ruau
January 12, 2022 1:13 AM
Scoop.it!

5 Ways to Save a Project That’s in Trouble

5 Ways to Save a Project That’s in Trouble | Devops for Growth | Scoop.it
The roller coaster of project management can get stressful—especially when you’re working on a project that has taken an unexpected turn for Doomsville. (And sometimes, it’s what’s being said around the office that’s the tell-tale sign your project’s in trouble.) Here, we look at 5 ways to pull your project back from the brink of disaster—or prevent it the next time around.
Mickael Ruau's insight:

 

1. Sign of trouble: “What problem are we trying to solve here?” Midway through any project, hearing this question should trigger a reassessment. It’s time to ask some hard honest questions, like: How has the project veered away from its original aims? What have you achieved so far? Is it enough that you still can accomplish at least some of the objectives? Is it best to stop now or modify the project? You know the project most intimately, so try to step back and look at the big picture with that knowledge of the details. Separate the consequences on your own career (it’s tough) from the best path for the project. If you’re convinced the project can succeed, make a powerful argument to clarify objectives and double-down on completing the project. This experience need not be a personal disaster, but how you finish the project can have broad implications.

2. Sign of trouble: “Failure is not an option.” Of course it is. Projects are risky—and you want to embrace the possibility of failure so that your team develops skills in recognizing signs of trouble and then responding to issues as they present themselves. The trick, as Liquid Planner guest blogger Susanne Madsen notes, is to fail productively: “It’s OK to experiment and to fail—in fact it’s necessary at times. How else can we find that ingenious new solution to our client’s problem?” Failure and mistakes can be productive as long as they propel organizations closer to the end goal. As Madsen states, the danger lies in the “demand for perfection, smooth execution and certainty” that leads people to “choose the safe option which gives them quick wins and fast results.”

 

3. Sign of trouble: “We should take this in a whole new direction.” This screams scope creep—or a project that’s grown out of its original goals, so address the situation directly. Sometimes, projects rewrite themselves as they get underway and do need to be re-assessed. If this happens, figure out what you need in order to change direction, declare the updated goals and get everyone on board. Identify the resources you have and the ones you’ll need to move forward. Then, reassess—and realign—stakeholder expectations. And lastly, take a lesson from #2, and learn from where the original project plan failed. You don’t want to make that mistake a second time in a row.

4. Sign of trouble: “You’re over budget.” It’s time for a mid-course correction, and it needs to happen soon. First, figure out how you got into this budget mess. Second, identify how to fix it going forward. Third, go to the Guardians of Your Budgets (and your boss) with an improved plan for finishing the project either within the original budget or with a button-down case for what the additional funds will yield. Fourth, learn from the first three steps so next time you can stay within budget—or set a more realistic budget.

 

5. Sign of trouble: “You’re way behind schedule.” Start by assessing why you’re late: Were key people pulled away from your project? Was the task more difficult than expected? Then devise a plan that goes beyond throwing more bodies at the problem. For example, get more time for your team from key producers. Prioritize needs and scale back on objectives. See if you can get more time from key producers on your team. Unfortunately, working faster or harder (more hours) usually produces more mistakes then getting you closer to your goal. The key here is to be flexible and know how to adapt when you miss the first milestone, because that’s when you’re headed off track. Also, use project management software that alerts you when you’re falling behind schedule before it’s too late.

No comment yet.
Scooped by Mickael Ruau
January 12, 2022 1:03 AM
Scoop.it!

Version Control Best Practices - DZone Agile

Version Control Best Practices - DZone Agile | Devops for Growth | Scoop.it
Working as a Version Control Focal Point

Moving on, I learned a lot during my time as a version control focal point. So things were learned from good experiences; others, not so much.
Good Experiences

You should rename files and directories via the version control system. This way, the physical file is not replicated to the server. Additionally, the full history is preserved and can be seen in a graph.

You can merge a hotfix from one version to another via the version control merge feature.
This is also commonly used for hotfix rollups.

Putting version related files which are often changed under version control.

Less Good Experiences

You should not submit a few non-related changes in one change list. This caused a mess. When only one of the changes had to be merged to a different version, it was going to be hard, time-wasting, manual work.

Don't save a lot of work locally without submitting for a long time. Note: sometimes, this is caused by developers avoiding opening development versions.

It's a bad idea to put files in version control that aren't recommended to be there, like generated files from the build process and large binary files that are not changed.

In summary, the version control system is here to help developers, and when used properly, it can be very helpful.
No comment yet.
Scooped by Mickael Ruau
January 11, 2022 1:56 AM
Scoop.it!

Identifying and Recovering Troubled Projects: How to Rescue your Project From its Failure – Ricardo Viana Vargas

Identifying and Recovering Troubled Projects: How to Rescue your Project From its Failure – Ricardo Viana Vargas | Devops for Growth | Scoop.it
The purpose of this article is to conceptualize and identify troubled projects and allow their evaluation and possible recovery, minimizing the…
Mickael Ruau's insight:

ESI International (ESI, 2005) developed an assessment process of troubled projects based on a process of interviews, analysis and consolidation of results that allow us to assess the problem’s potential and the chances of recovering the project. The process is highlighted in Exhibit 05. In this process the participation of the main stakeholders and their personal perceptions are the key to the success of a possible recovery of the project.

Exhibit 05 – Troubled project assessment model (ESI, 2005).

Several other models can be developed to identify scenarios in each organization. However, all these models should include a brief, quick, direct assessment; otherwise, when a project is identified as a problem it might be too late to recover it.

Project Recovery vs. Project Termination

Once the troubled project is assessed, we have to make the decision of aborting or recovering the project. Different factors may influence this process, but some basic considerations have to be observed. LONG (2003) proposes five key questions that should be considered to decide if the project will be recovered or aborted, as follows:

  1. 1. How important is the project for the sponsor, the stakeholders, and the organization?
  2. 2. Can the project continue as planned and defined or does it need to be completely redefined?
  3. 3. The organizational impacts and the resource needs for the recovery are feasible to produce the desired recovery?
  4. 4. Is there a need for political support so that the project can be recovered?
  5. 5. Are you (the project manager) personally motivated and interested to do what needs to be done to recover the project?

As a complement to the five previous questions, several factors can evidence that there is no chance of recovering the project. The most common factors are as follows:

  • • Business benefit to be generated by the business cannot be delivered
  • • The political environment is no longer sustainable
  • • There is no longer a project sponsor and there is no apparent capacity to replace them
  • • The business needs have changed
  • • There have been significant changes in technology
  • • Contractual or judicial dispute in progress that makes the project unfeasible
  • • Market conditions have changed

If you decide to discontinue the project, its early termination can be carried out in two different ways, each with its own level of complexity, speed, and stress.

STEWART & SHEREMETA (2000) assessed the different drivers and impacts involved in the early termination of a project. They say that there are basically four ways to terminate a project, as follows:

  • • Addition – Discontinue the project by adding the work to be performed and all its resources to a larger project.
  • • Absorption – Discontinue the project having another project absorbing the work of the troubled project, without the resources and infrastructure accompanying the work.
  • • Inanition – Discontinue the project by inanition (starvation), with the resources that sustain the project no longer being supplied, and the project being terminated due to complete lack of resources.
  • • Extinction – Discontinue the project by extinguishing it, with an immediate cancellation action being taken, and the project ceasing to exist and only the work already completed and that can possibly be used is recovered.
No comment yet.
Scooped by Mickael Ruau
January 11, 2022 1:05 AM
Scoop.it!

The Traditional Test Automation Pyramid, Pitfalls and Anti-patterns

The Traditional Test Automation Pyramid, Pitfalls and Anti-patterns | Devops for Growth | Scoop.it

We may prefer Unit and Integration tests for bad reasons

The points referred in the Agile Pyramid but focusing mainly on unit tests could be done for bad reasons. Three different typologies will be covered: Organisational, Process and Tooling.



A first reason can be related to lack of maturity or budget for test activity and test engineer allocation. It usually results with developers validating their own development, increasing the technical debt with to much unit tests.

Another reason usually mention that tests are done too late in the process, thus having low value and slowing down the whole delivery. In fact, most of time the inclusion of test from the design – also known as shift-left pattern – is not done. It is a typical factor of having tests started too late in the process.

The last one, related to tooling, miss an automated testing solution fulfilling the automation requirements: flexible configuration, fast execution and feedback loop, CI/CD ready, accessible to the whole team.

Functional and end-to-end tests usually fail due to lack of Skills, Automation & Tooling. We can reverse the point of view of the previous point, from a functional test automation perspective. The difficulties raised in the ecosystem reside in the capacity to deliver a successful test automation strategy.



In a lot of cases, the tests are partially automated, resulting in costly tests, harder to maintain over time. Other experiences usually lack trained testers and software testing competencies. The outcomes resulting in fragile tests, with manual data setting, lacking reuse, technical and design quality. This type of experience also results in a poor functional test automation experience.

Organisations also implement models that were not proven to scale or focused on the bad priority, thus increasing the tests complexity, execution time, maintenance. It usually resides in lack of design and analysis, and method selection like equivalent partitioning, boundary value analysis, decision-table testing, state transition, use-cases, … appropriated to each context. We get back to lack of proper investment and skill in the test activity.
No comment yet.
Scooped by Mickael Ruau
January 11, 2022 12:55 AM
Scoop.it!

Software Development: Agile Version Control

Software Development: Agile Version Control | Devops for Growth | Scoop.it
Agile version control is very different to traditional version control. It is performed using many small feature branches which are being continually merged back into the trunk (or main development stream). This is necessary for the practice of Continuous Integration (CI) which is a core part of the Agile approach.

CI is an example of JIT (and hence DIRE) allowing problems to be found as soon as possible. It also supports other Agile practices such as short sprints and evolving the software using small, simple, user-centric User Stories. Use of CI depends on a version control system that allows easy branching and merging.

Most Agile teams also have two ongoing code streams (see Diagram 7) - the development "branch(es)" and the delivery "trunk". Again, this relies on a version control system that supports easy merging.

As far as I know Git is the only version control system currently available where a version node in the repository can have two parents. In other words Git allows you to automatically and safely merge code from different sources.

Although Git is not without it's problems (which I will discuss next month) I think using it is essential for Agile development to work smoothly. I will discuss the day-to-day use of different version controls systems (including Git) next month.
Mickael Ruau's insight:

Agile version control using Git is simple. A developer branches the code to work on a User Story. Git makes it easy to merge the branch back into the trunk. A simple example is shown in the following diagram where all User Story branches are merged back into the trunk by the end of each sprint.

Diagram 6. Agile Version Control


However, generally you need control of what features are delivered to "production". This is often accomplished by having dual streams - an on-going "development" stream (or branch) and a separate "delivery" stream (trunk) allowing control over when features are delivered.

Diagram 7. Dual Streams


This is very different from traditional version control where branches are eventually discarded (after possibly having been merged back into the trunk) - instead you have two on-going streams. This approach is only possible with a version control system such as Git where a version (ie, a node in the diagrams) can have two parents - in the diagrams this is any node with two outgoing arrows.

For a large project with multiple teams I have even seen the suggestion of multiple on-going "development" branches (eg: see Version Control for Multiple Agile Teams). I have not tried this but I have reservations because code merges between the teams would occur irregularly and might easily be forgotten (remember the rule of merge early and often). The two teams might create conflicting changes which are not discovered until the conflicting code is merged from the trunk into the other teams stream.

 

Diagram 8. Multiple Development Streams
No comment yet.
Scooped by Mickael Ruau
January 10, 2022 8:15 AM
Scoop.it!

From Branch Merge Hell to Trunk-based Development - A Bank Agile Case Study 2/n

From Branch Merge Hell to Trunk-based Development - A Bank Agile Case Study 2/n | Devops for Growth | Scoop.it


In the first part of the case-study, we looked at the difficult conditions the team lived in. That was more to do with technical processes they used for handling multiple projects at the same time. This part focuses on how they moved on from the branch merge hell they lived in.

== Part 2==

It was evident that the code branches just postponed the pain. That pain would eventually become huge but difficult-to-deal-with after a couple of months.

Over time, the team realized two things from the Continuous Integration (CI) philosophy (yes, I call it a philosophy).
If it’s hard to do something, you are not doing it often enough!
If delta is small, so is the risk.

The team had a hard time in merging feature branches with mainline. That just meant, the team was not doing the code-merge often enough.
Moving to Trunk Based Development

After lots of analysis and experiments, the team decided to move towards trunk-based development. They stopped creating feature branches for new projects and started working on the trunk only. The merge-pain in this approach, though multiple times every day, was relatively small. The team would sort them out through active collaboration.

The idea is to let developers develop and push code in the trunk at regular intervals. That works only when the code has a safety net around.
No comment yet.
Scooped by Mickael Ruau
January 10, 2022 2:10 AM
Scoop.it!

Talk First, Code Later

Talk First, Code Later | Devops for Growth | Scoop.it
When making changes to a system you are not familiar with, follow these steps to reduce churn:

Summarize the problem you're trying to solve. Talk with people owning the system, sharing your problem.
Share and validate the fix you're thinking of. Reach out to engineers on the owning team: in-person, over chat/email or a call, and talk
Describe your code changes clearly, following pull request best practices. Especially when working across timezones, you might not be able to verify your fix: a clear description will help in this case.
Do the above, especially when working with remote teams or across timezones. It's tempting to think, "oh, the owning team is another timezone, I'll just write the code while they sleep." Still, it's far more efficient to shoot an email summarizing the problem and your approach first. If you're in a hurry, you can also write the code and submit a pull request at the same time: you already are offering a lot more context this way. However, in the majority of cases, getting that initial validation can save many revisions of back-and-forth.

It's interesting how problems like this are mostly nonexistent when the whole team is colocated. However, when working across locations, the "talk first, code later" approach is an un-intuitive tool that speeds development up and leads to better communication between engineers and teams. This is despite how it feels like it will slow things down by delaying writing code.
No comment yet.
Scooped by Mickael Ruau
January 10, 2022 1:13 AM
Scoop.it!

Is Scrum empirical? Sort of, but mostly your usage of it is not!

Is Scrum empirical? Sort of, but mostly your usage of it is not! | Devops for Growth | Scoop.it

Let me start by saying that Scrum has an empirical design model at its heart, but the use of Scrum is mostly not empirical. To understand this, we have to go back in time a little.

Mickael Ruau's insight:

Key Takeaways otherwise known as TL:DR

  1. There are no pillars of empiricism.
  2. Scrum invented/created their own empirical model.
  3. Scrum is empirical, but most usage of it is not.
  4. True empiricism is inductive reasoning.
  5. Creating products requires Deductive, Inductive and Abductive reasoning.
  6. Most Scrum and Agile is Determinate Cumulative Iteration and not Inductive.

 

No comment yet.
Scooped by Mickael Ruau
January 10, 2022 1:03 AM
Scoop.it!

Testing References - Here Be Pyramids

Testing References - Here Be Pyramids | Devops for Growth | Scoop.it
On this page, an overview of test automation pyramids can be found. The collection started as an exploration of the development of models in software testing. The test automation pyramid turned out to be a very popular model and has seen a great deal of modifications and varations since its conception by Mike Cohn in 2004.
No comment yet.
Scooped by Mickael Ruau
January 9, 2022 11:12 AM
Scoop.it!

Empiricism in Scrum. Dictionary meaning of Empiricism — | by Saurabh Dhingra | Be Agile

Empiricism in Scrum. Dictionary meaning of Empiricism — | by Saurabh Dhingra | Be Agile | Devops for Growth | Scoop.it
very event in Scrum provides a moment to inspect and adapt —
No comment yet.
Scooped by Mickael Ruau
January 9, 2022 10:19 AM
Scoop.it!

Exaptation — Wikipédia

Exaptation - Wikipédia

Un article de Wikipédia, l'encyclopédie libre. Dans la théorie de l'évolution, l' exaptation est une adaptation sélective opportuniste, privilégiant des caractères qui sont utiles à une nouvelle fonction, pour laquelle ils n'avaient pas été initialement sélectionnés. Par exemple, les plumes des théropodes, initialement sélectionnées parce qu'elles assureraient leur thermorégulation, ont permis l'adaptation au vol.

Mickael Ruau's insight:
 

Confusion entre pré-adaptation, adaptation et exaptation

Entre 1901 et 1909, Lucien Cuénot élabore la théorie de la préadaptation qui rencontrera moins de succès que celle de l'exaptation « plus conforme aux standards scientifiques du XXe siècle », la formulation de Cuénot étant trop téléologique selon Gould et Vrba. Ces deux concepts se révèlent complémentaires : « la préadaptation concernerait le caractère avec sa fonction d'origine tandis que l'exaptation concernerait le caractère avec sa fonction dérivée3 ».

Bien que les termes adaptation et exaptation soient souvent associés, ils ont des sens distincts :

  • Une adaptation est le développement d’un caractère doté d'une fonction particulière qui permet à l’organisme le possédant d’améliorer sa valeur sélective (fitness).
  • Une exaptation est le développement d’un caractère doté d'une fonction première qui, par la sélection naturelle, évolue au fil du temps pour jouer un tout nouveau rôle. Contrairement à l’adaptation, où la modification du phénotype (par exemple par le biais de mutations génétiques) est essentielle, l’exaptation n’amène aucun changement phénotypique.

Bien souvent, la littérature parle de l’exaptation comme d’un phénomène secondaire à l’adaptation. Toutefois, une adaptation peut également se produire à la suite d’une exaptation. On dit alors qu’un caractère subit une exaptation primaire, suivie d’une adaptation secondaire4.

Types d'exaptation

On considère généralement deux grands types d'exaptation4 :

  • Dans le premier type, un organe non modifié est réutilisé à l'identique pour une fonction manifestement non sélectionnée à l'origine (coaptation ou exaptation par cooption). C'est ainsi le cas de certaines zones du cerveau humain ; utilisées initialement pour la reconnaissance des formes, le langage ou l'audition, elles sont aujourd'hui réutilisées pour la lecture ou la musique. C'est également probablement le cas de la bipédie5.
  • Dans le second type, l'exaptation est une forme particulière d'adaptation naturelle, c'est-à-dire un ensemble de mutations génétiques sélectionnées par la sélection naturelle. Mais cette adaptation se fait sur la base d'un organe qui s'est initialement développé pour un tout autre usage. Le poumon des tétrapodes peut ainsi être considéré comme une exaptation : apparu chez des poissons comme une adaptation à des milieux aquatiques hypoxiques ou bien oxygénés (en lien dans ce dernier cas avec les besoins accrus en oxygène du cœur6,7), il se serait secondairement modifié pour fonctionner en milieu purement terrestre.
No comment yet.
Scooped by Mickael Ruau
January 8, 2022 2:50 AM
Scoop.it!

Dropbox explainer video? You're missing most of their Lean Startup story...



When Dropbox launched, a number of cloud storage competitors with deep pockets already existed: Google Drive, iCloud, AWS, Carbonite, to name a few. To get their product off the ground, Dropbox had to be different. And simple to understand.

Mickael Ruau's insight:

Hypothesis: Latent demand for product concept X makes product development worthwhile

Test type: Value Hypothesis

Success Criteria: Able to get signups based on description
dropbox landing page launch tomorrowSimplicity captures interest

Traffic Source: social media and online communities

If we build it, how will we acquire traffic?
Who exactly will be interested?
Are they interested enough to establish a relationship with us?
What kind of conversion rates do we get?

Result: Pass. The team was able to acquire traffic that converted based on a description on a landing page. At the same time, they were building prototypes to assess the technical viability of the product idea. As this initial market test proved that some pent up demand existed, the team dug further.

Step Back: This test established baselines, which could then be used to explore the product presentation further. Also, it helped them reach out and establish contact with their market, independently of their immediate personal network, thus providing a slightly more unbiased signal. Also, using such a page potentially allowed them to test a path to market, to locate their most rabid fans.