 Your new post is loading...
 Your new post is loading...
|
Scooped by
nicoleta susanu
May 22, 2021 4:37 AM
|
|
Scooped by
nicoleta susanu
May 19, 2021 4:33 AM
|
|
Scooped by
nicoleta susanu
November 11, 2020 9:31 AM
|
The Council presidency and the European Parliament reached a political agreement on the multiannual financial framework for 2021-2027.
|
Scooped by
nicoleta susanu
July 1, 2020 4:47 AM
|
The Funding and Tenders Portal is the single entry point (the Single Electronic Data Interchange Area) for applicants, contractors and experts in funding programmes and procurements managed by the European Commission.
|
Scooped by
nicoleta susanu
June 26, 2020 4:41 AM
|
The Funding and Tenders Portal is the single entry point (the Single Electronic Data Interchange Area) for applicants, contractors and experts in funding programmes and procurements managed by the European Commission.
|
Scooped by
nicoleta susanu
June 22, 2020 4:01 AM
|
The Funding and Tenders Portal is the single entry point (the Single Electronic Data Interchange Area) for applicants, contractors and experts in funding programmes and procurements managed by the European Commission.
|
Scooped by
nicoleta susanu
June 18, 2020 4:20 AM
|
|
Scooped by
nicoleta susanu
June 5, 2020 3:56 AM
|
Make your green idea a reality: Apply now for LIFE funding
|
Scooped by
nicoleta susanu
June 1, 2020 5:32 AM
|
Women in Economics Scholarship
|
Scooped by
nicoleta susanu
May 28, 2020 3:58 AM
|
|
Scooped by
nicoleta susanu
May 25, 2020 5:16 AM
|
The 165 000 current Erasmus+ exchange students and 5000 EU volunteers need reassurance that they will be reimbursed and retain their status, MEPs say.
|
Scooped by
nicoleta susanu
May 22, 2020 4:06 AM
|
COVID-19 - essential practical advice on Erasmus+ and European Solidarity Corps mobility
|
Scooped by
nicoleta susanu
May 18, 2020 4:18 AM
|
The Funding and Tenders Portal is the single entry point (the Single Electronic Data Interchange Area) for applicants, contractors and experts in funding programmes and procurements managed by the European Commission.
|
|
Suggested by
Liz Angelene M Verano
May 20, 2021 4:35 AM
|
Have you ever had a project which never seems to end? One which you either underestimated or kept adding tasks to as you went along? That's exactly what setting out your project scope will prevent. By analyzing the elements of your projects before starting, you can set out the scope of the work in order to prevent
|
Scooped by
nicoleta susanu
November 13, 2020 3:42 AM
|
2020 Erasmus accreditation in the field of Youth
|
Scooped by
nicoleta susanu
July 4, 2020 10:16 AM
|
The Funding and Tenders Portal is the single entry point (the Single Electronic Data Interchange Area) for applicants, contractors and experts in funding programmes and procurements managed by the European Commission.
|
Scooped by
nicoleta susanu
June 29, 2020 5:32 AM
|
The Funding and Tenders Portal is the single entry point (the Single Electronic Data Interchange Area) for applicants, contractors and experts in funding programmes and procurements managed by the European Commission.
|
Scooped by
nicoleta susanu
June 24, 2020 4:10 AM
|
The Funding and Tenders Portal is the single entry point (the Single Electronic Data Interchange Area) for applicants, contractors and experts in funding programmes and procurements managed by the European Commission.
|
Scooped by
nicoleta susanu
June 20, 2020 10:05 AM
|
Town Twinning 2020 – Round 2
|
Scooped by
nicoleta susanu
June 16, 2020 9:16 AM
|
2021 operating grants for NGOs
|
Scooped by
nicoleta susanu
June 3, 2020 4:39 AM
|
Frequently asked questions (FAQs)
|
Scooped by
nicoleta susanu
May 30, 2020 4:11 AM
|
Innovasjon Norge - vi gir lokale ideer globale muligheter
|
Scooped by
nicoleta susanu
May 27, 2020 3:40 AM
|
Today 6th April 2020, the Ministry of Environment and Water announce the Call for proposals “Small Grant Scheme circular economy” under Outcome 3: “Improved use of resources at the municipal level (circular economy)” under the Environment Protection…
|
Scooped by
nicoleta susanu
May 24, 2020 4:33 AM
|
The objective of the call for capitalisation projects is to foster the transfer, exploitation and mainstreaming of knowledge and results developed under different Euro-Mediterranean initiatives, including the ENPI/ENI CBC Med Programmes, the Union for the Mediterranean and the Interreg MED Programme.
|
Scooped by
nicoleta susanu
May 20, 2020 1:27 PM
|
European Youth Together 2020
|
Scope: Projects should focus on development and demonstration of solutions which significantly reduce the cost of new buildings with at least 'nearly zero-energy' performance levels, whilst accelerating significantly the speed with which these buildings and their systems are taken up by the market. The focus should lie on solutions for appropriate indoor air quality and comfort, design adapted to local climate and site, passive solutions (reducing the need for technical building systems which consume energy) or active solutions (covering a high share of the energy demand with renewable energies), building energy management systems (where appropriate), highly efficient Heating, Ventilation and Air-Conditioning (HVAC, e.g. low temperature systems, solar cooling), electric and/or thermal energy storage of renewable energy onsite and nearby. Projects should also provide solutions for automated and cost-effective maintenance of the installed equipment, and assess differences between predicted and actual energy performance. Such differences should be documented and minimized.The applied solutions should address the challenge to move towards a 'nearly-zero energy' buildings standard at large scale with demonstration projects that go beyond 'nearly-zero energy' buildings levels to the point where buildings are active contributors to energy production and environmental quality in particular when new districts are planned (e.g. net-zero energy neighbourhoods). The energy balance should be calculated by means of a LCA approach, considering among other issues embodied energy.
Expected Impact: Significant increase of the share of 'nearly zero-energy' buildings with the aim of 100% market uptake by the end of 2020. Costs reductions of at least 15% compared to current situation, with additional benefits in terms of energy reduction. Demonstration for net-zero energy districts taking advantage of onsite or nearby-generation of renewable energy.
Deadline: 04.02.2015