Embedded Systems News
1.3M views | +3 today
 
Scooped by cnxsoft
onto Embedded Systems News
August 1, 2011 9:59 PM
Scoop.it!

Over 40 Percent of Embedded Projects are Behind Schedule

VDC Research has published a research note entitled “Running Behind Schedule: The Crisis in Software & System Development” where they surveyed some embedded and enterprise developers and got the result that over 40% of developers...
No comment yet.
Embedded Systems News
Embedded Software programming, testing and life cycle. Development platforms and SDK/BSP. Linux and Android tips. Product news about news MCU, MPU, Chipset and retail products realted to embedded systems
Curated by cnxsoft
Your new post is loading...
Your new post is loading...
Scooped by cnxsoft
September 12, 9:42 PM
Scoop.it!

NeoEyes NE302 - A tiny USB-C-powered WiFi 6 Edge AI Vision camera based on STM32N6 MCU - CNX Software

NeoEyes NE302 - A tiny USB-C-powered WiFi 6 Edge AI Vision camera based on STM32N6 MCU - CNX Software | Embedded Systems News | Scoop.it
CamThink NeoEyes NE302 is a tiny WiFi 6 Edge AI camera based on an STM32N6 Arm Cortex-M55 MCU with Neural-ART NPU which the company says is "especially...
No comment yet.
Scooped by cnxsoft
September 12, 9:42 PM
Scoop.it!

ESP32-C5 Pico board follows Raspberry Pi Pico form factor, ships with on-board or external antenna - CNX Software

ESP32-C5 Pico board follows Raspberry Pi Pico form factor, ships with on-board or external antenna - CNX Software | Embedded Systems News | Scoop.it
Waveshare ESP32-C5 Pico board brings the ESP32-C5 dual-band WiFi 6, Bluetooth LE, and 802.15.4 (Zigbee/Thread) SoC to the Raspberry Pi Pico form factor.
No comment yet.
Scooped by cnxsoft
September 12, 9:42 PM
Scoop.it!

Radxa Linkr - A USB drive-sized IP KVM with USB-C, Ethernet, and WiFi support - CNX Software

Radxa Linkr - A USB drive-sized IP KVM with USB-C, Ethernet, and WiFi support - CNX Software | Embedded Systems News | Scoop.it
Radxa Linkr is a compact, USB flash drive-sized IP KVM that connects to the target through HDMI and USB for video, keyboard, and mouse emulation.The user...
No comment yet.
Scooped by cnxsoft
September 12, 9:42 PM
Scoop.it!

LattePanda Mu Ultra Compute Module features Intel Core Ultra 5 226V/7 256V Lunar Lake CPU for AI workloads - CNX Software

LattePanda Mu Ultra Compute Module features Intel Core Ultra 5 226V/7 256V Lunar Lake CPU for AI workloads - CNX Software | Embedded Systems News | Scoop.it
The LattePanda Mu Ultra is an x86 Compute Module powered by an Intel Core Ultra 5 226V or Ultra 7 256V Lunar Lake processor and equipped with 16GB of DDR5...
No comment yet.
Scooped by cnxsoft
September 12, 9:41 PM
Scoop.it!

D-Robotics RDK S100P - A 128 TOPS alternative to NVIDIA Jetson Orin NX 16GB with Cortex-A78AE/R52+ cores - CNX Software

D-Robotics RDK S100P - A 128 TOPS alternative to NVIDIA Jetson Orin NX 16GB with Cortex-A78AE/R52+ cores - CNX Software | Embedded Systems News | Scoop.it
D-Robotics RDK S100P development kit is a robotics SBC built around an S100P-based module providing an alternative to NVIDIA Jetson Orin NX 16GB with a...
No comment yet.
Scooped by cnxsoft
September 12, 9:41 PM
Scoop.it!

XIAO SAMD21 Plus and RP2040 Plus USB-C boards get additional GPIO pins, integrated Li-ion battery management - CNX Software

XIAO SAMD21 Plus and RP2040 Plus USB-C boards get additional GPIO pins, integrated Li-ion battery management - CNX Software | Embedded Systems News | Scoop.it
Seeed Studio has expanded its XIAO Plus Series introduced in 2025, with the XIAO SAMD21 Plus and XIAO RP2040 Plus USB-C boards adding several GPIOs and...
No comment yet.
Scooped by cnxsoft
September 12, 9:41 PM
Scoop.it!

Amlogic A311Y3 Cortex-A78/A55 Edge AI system-on-module delivers up to 8 TOPS - CNX Software

Amlogic A311Y3 Cortex-A78/A55 Edge AI system-on-module delivers up to 8 TOPS - CNX Software | Embedded Systems News | Scoop.it
Boardcon CM311Y3 system-on-module (SoM) is powered by an Amlogic A311Y3 octa-core Cortex-A78/A55 SoC with an 8 TOPS NPU and targets 4K video surveillance...
No comment yet.
Scooped by cnxsoft
September 12, 9:41 PM
Scoop.it!

OpenTrailPaper transforms LILYGO T5 E-Paper S3 Pro devkit into a DIY e‑paper bike computer - CNX Software

OpenTrailPaper transforms LILYGO T5 E-Paper S3 Pro devkit into a DIY e‑paper bike computer - CNX Software | Embedded Systems News | Scoop.it
OpenTrailPaper is an open-source, DIY e-paper bike computer project comprised of firmware for the ESP32-S3-based T5 E-Paper S3 Pro devkit and Android and...
No comment yet.
Scooped by cnxsoft
September 12, 9:41 PM
Scoop.it!

GPIBee (UsbGpib V3) USB-to-GPIB adapter gains Ethernet (PoE), but launches as closed-source hardware - CNX Software

GPIBee (UsbGpib V3) USB-to-GPIB adapter gains Ethernet (PoE), but launches as closed-source hardware - CNX Software | Embedded Systems News | Scoop.it
GPIBee is a USB and Ethernet (PoE) to GPIB adapter adding modern hardware to legacy GPIB/IEEE-488 instruments and an easy-to-use web interface...
No comment yet.
Scooped by cnxsoft
September 12, 9:40 PM
Scoop.it!

Arm CSS for Mobile 2 "AI-Native" platform: Arm C2-Ultra and C2-Pro CPU cores, Mali G2-Ultra NX GPU - CNX Software

Arm CSS for Mobile 2 "AI-Native" platform: Arm C2-Ultra and C2-Pro CPU cores, Mali G2-Ultra NX GPU - CNX Software | Embedded Systems News | Scoop.it
Arm has introduced the CSS for Mobile 2 platform as an AI-native compute foundation comprised of the Arm C2-Ultra and C2-Pro CPUs with SME2 (Scalable...
No comment yet.
Scooped by cnxsoft
September 12, 9:40 PM
Scoop.it!

FREE-WILi 2 portable hacking multitool features two RP2350 MCUs, ESP32-C5, ICE40 FPGA, and Raspberry Pi CM0 - CNX Software

FREE-WILi 2 portable hacking multitool features two RP2350 MCUs, ESP32-C5, ICE40 FPGA, and Raspberry Pi CM0 - CNX Software | Embedded Systems News | Scoop.it
The FREE-WILi 2 (Founder Edition) is an open-hardware, portable hacking multitool and lab designed for hardware hackers, pentesters, and embedded system...
No comment yet.
Scooped by cnxsoft
September 12, 9:40 PM
Scoop.it!

Reverse Engineering Without CAD Data: How MetroY Ultra Turns Physical Parts into Digital Designs (Sponsored) - CNX Software

Reverse Engineering Without CAD Data: How MetroY Ultra Turns Physical Parts into Digital Designs (Sponsored) - CNX Software | Embedded Systems News | Scoop.it
When the Part Exists, but the Data Doesn’t Reverse engineering often starts with a physical part but no reliable digital data.In restoration and...
No comment yet.
Scooped by cnxsoft
September 12, 9:40 PM
Scoop.it!

ARK Just A Pi - A tiny NDAA-compliant Raspberry Pi CM5 carrier board for drones and robots - CNX Software

ARK Just A Pi - A tiny NDAA-compliant Raspberry Pi CM5 carrier board for drones and robots - CNX Software | Embedded Systems News | Scoop.it
ARK Just A Pi is a tiny NDAA-compliant carrier board for the Raspberry Pi CM5 designed for drones, robots, or other space-constrained embedded...
No comment yet.
Scooped by cnxsoft
September 12, 9:42 PM
Scoop.it!

Orange Pi Zero 4 - Compact Allwinner A733 SBC offers HDMI, USB-C DP, GbE, WiFI 6, PCIe FFC connector for $26.5 and up - CNX Software

Orange Pi Zero 4 - Compact Allwinner A733 SBC offers HDMI, USB-C DP, GbE, WiFI 6, PCIe FFC connector for $26.5 and up - CNX Software | Embedded Systems News | Scoop.it
Orange Pi Zero 4 is an affordable yet feature-rich Allwinner A733 single board computer (SBC) with up to 8GB RAM, eMMC/UFS storage footprint, a microSD...
No comment yet.
Scooped by cnxsoft
September 12, 9:42 PM
Scoop.it!

XIAO SAMD21 Plus and RP2350 Plus USB-C boards get additional GPIO pins, integrated Li-ion battery management - CNX Software

XIAO SAMD21 Plus and RP2350 Plus USB-C boards get additional GPIO pins, integrated Li-ion battery management - CNX Software | Embedded Systems News | Scoop.it
Seeed Studio has expanded its XIAO Plus Series introduced in 2025, with the XIAO SAMD21 Plus and XIAO RP2350 Plus USB-C boards adding several GPIOs and...
No comment yet.
Scooped by cnxsoft
September 12, 9:42 PM
Scoop.it!

ArduinoCore-Zephyr 1.0.0 adds support for Arduino VENTUNO Q, updates to Zephyr 4.4.1, and more - CNX Software

ArduinoCore-Zephyr 1.0.0 adds support for Arduino VENTUNO Q, updates to Zephyr 4.4.1, and more - CNX Software | Embedded Systems News | Scoop.it
Arduino has just announced the release of ArduinoCore-Zephyr version 1.0.0, with new hardware support, including the VENTUNO Q SBC, an updated Zephyr...
No comment yet.
Scooped by cnxsoft
September 12, 9:42 PM
Scoop.it!

ArmSoM Sige6 Allwinner A733 SBC features up to 128GB soldered-on eMMC flash, 16GB LPDDR5 - CNX Software

ArmSoM Sige6 Allwinner A733 SBC features up to 128GB soldered-on eMMC flash, 16GB LPDDR5 - CNX Software | Embedded Systems News | Scoop.it
ArmSoM Sige6 is yet another SBC powered by the Allwinner A733 octa-core SoC, offered in a credit card form factor with up to 128GB soldered-on eMMC flash...
No comment yet.
Scooped by cnxsoft
September 12, 9:41 PM
Scoop.it!

Petoi Quaddle - A mini robot dog for physical AI experimentation (Crowdfunding) - CNX Software

Petoi Quaddle - A mini robot dog for physical AI experimentation (Crowdfunding) - CNX Software | Embedded Systems News | Scoop.it
If you are not into ducks, but still would like to play around with physical AI, the Petoi Quaddle is a mini robot dog equipped with 4 servos controlling...
No comment yet.
Scooped by cnxsoft
September 12, 9:41 PM
Scoop.it!

ARK Just A Pi - A tiny NDAA-compliant Raspberry Pi CM5 carrier board for drones and robots - CNX Software

ARK Just A Pi - A tiny NDAA-compliant Raspberry Pi CM5 carrier board for drones and robots - CNX Software | Embedded Systems News | Scoop.it
ARK Just A Pi is a tiny NDAA-compliant carrier board for the Raspberry Pi CM5 designed for drones, robots, or other space-constrained embedded...
No comment yet.
Scooped by cnxsoft
September 12, 9:41 PM
Scoop.it!

DIY ESP32-P4 weather station & air quality monitor connects to LoRa and ESP-NOW sensors, various weather APIs - CNX Software

DIY ESP32-P4 weather station & air quality monitor connects to LoRa and ESP-NOW sensors, various weather APIs - CNX Software | Embedded Systems News | Scoop.it
Harald Kreuzer has built an ESP32-P4 weather station and air quality monitor that features a 10.1-inch dashboard display and a built-in Sensirion SEN66...
No comment yet.
Scooped by cnxsoft
September 12, 9:41 PM
Scoop.it!

Circuit Valley CHC5 - A modular USB, HDMI, and Ethernet camera system (Crowdfunding) - CNX Software

Circuit Valley CHC5 - A modular USB, HDMI, and Ethernet camera system (Crowdfunding) - CNX Software | Embedded Systems News | Scoop.it
Circuit Valley's CHC5 is a modular camera system based on a Core board powered by an AMD/Xilinx Zynq-7020 SoC FPGA, a range of interface boards with USB,...
No comment yet.
Scooped by cnxsoft
September 12, 9:40 PM
Scoop.it!

LightMake L4 3D printer features four independent heads for simultaneous or multi-color printing (Crowdfunding) - CNX Software

LightMake L4 3D printer features four independent heads for simultaneous or multi-color printing (Crowdfunding) - CNX Software | Embedded Systems News | Scoop.it
The LightMake L4 is a desktop 3D printer with four independent printing heads for high-throughput multi-color, multi-material, and batch production.It...
No comment yet.
Scooped by cnxsoft
September 12, 9:40 PM
Scoop.it!

Artery AT32F406 and AT32F408 Cortex-M4F MCUs feature optional high-speed USB OTG PHY - CNX Software

Artery AT32F406 and AT32F408 Cortex-M4F MCUs feature optional high-speed USB OTG PHY - CNX Software | Embedded Systems News | Scoop.it
Artery Technology AT32F406 and AT32F408 are two new Arm Cortex-M4F MCUs running at up to 216 MHz, with the F408 adding USB OTG High-Speed and an...
No comment yet.
Scooped by cnxsoft
September 12, 9:40 PM
Scoop.it!

TickrCast - An ESP32-S3 HUB75 LED ticker display with server-side rendering and OTA (Crowdfunding) - CNX Software

TickrCast - An ESP32-S3 HUB75 LED ticker display with server-side rendering and OTA (Crowdfunding) - CNX Software | Embedded Systems News | Scoop.it
Layered Ventures LLC has launched the TickrCast, an expandable HUB75 LED ticker display built around an ESP32-S3.The TickrCast ships as a full consumer...
No comment yet.
Scooped by cnxsoft
September 12, 9:40 PM
Scoop.it!

Arduino UNO Media Carrier adds MIPI CSI/DSI and audio connectors to UNO Q and VENTUNO Q boards - CNX Software

Arduino UNO Media Carrier adds MIPI CSI/DSI and audio connectors to UNO Q and VENTUNO Q boards - CNX Software | Embedded Systems News | Scoop.it
Arduino UNO Media Carrier board adds three audio jacks, a MIPI DSI display connector, two MIPI CSI camera connectors, and a few RGB LEDs to the Arduino...
No comment yet.