7 Signs Your Project is Headed for Failure

7 Signs Your Project is Headed for Failure | Devops for Growth | Scoop.it


Into every project manager’s life a few clunkers must fall. Some failures are preventable; others are out of our hands. But all of us like to imagine we can avoid the worst of the catastrophes… or at least escape with our reputations intact.

How can you tell that your project is aimed directly at #headdesk territory? Take heed of these warning signs. If you identify the uh-oh moments soon enough, perhaps you can take remedial action and save the situation. Maybe you can walk away, take a deep breath, reanalyze the requirements, and reset the team. We’d like to think so!
No comment yet.
Scooped by Mickael Ruau
November 2, 2021 8:06 AM
Scoop.it!

Gestion des risques d'un projet — Wikipédia

Gestion des risques d'un projet - Wikipédia

La gestion des risques d'un projet est un cas particulier de gestion des risques, appliquée dans le domaine de la gestion de projet. Un projet présente le plus souvent la double caractéristique de se dérouler suivant un processus défini pour l'occasion, et d'avoir une organisation et des objectifs qui évoluent très fortement dans le temps avec l'avancement du projet.

No comment yet.
Scooped by Mickael Ruau
September 29, 2021 1:23 AM
Scoop.it!

Heuristics And Biases That You Need To Know

Heuristics And Biases That You Need To Know | Devops for Growth | Scoop.it
Read Next: Heuristics, Biases. Main Guides: Business Models Business Strategy Business Development Distribution Channels Marketing Strategy Platform Business Models Network Effects More ResourcesWhat Are Biases Really And Why We Got It All Wrong…What Is a Business Model? 54 Successful Types of…Eight Things You Need To Know About Business Model…10 Fallacies In Business You Need To … Continue reading Heuristics And Biases That You Need To Know
No comment yet.
Scooped by Mickael Ruau
July 3, 2021 3:19 AM
Scoop.it!

Comment peut-on apprendre en avance et rapidement ?

Comment peut-on apprendre en avance et rapidement ? | Devops for Growth | Scoop.it
Cette news revient sur la réflexion de Sami Honkonen, Jerry Neumann, Bruce Nussbaum, Michael Plishka, Al Shalloway et Alistair Cockburn sur le meilleur moyen pour une équipe d'anticiper rapidement leur besoin d'apprendre pour palier à un problème.
Mickael Ruau's insight:

Au lieu de subir des échecs et d'en tirer des leçons, on peut planifier un apprentissage comme le décrit Alistair Cockburn dans son rapport how "learn early, learn often" takes us beyond risk reduction où il explore des approches pour apprendre plus tôt dans le développement du produit:

Le problème n'est pas que l'apprentissage ne se fait pas suivant l'approche traditionnelle, mais qu'il intervient à l'intégration et de nouveau, à la vente, c'est-à-dire tard. Ce sont souvent les premiers moments où les membres de l'équipe doivent mettre leurs idées en commun, et la première fois que le client, l'utilisateur ou l'acheteur peuvent voir le nouveau système.

Il mentionne quatre catégories de connaissances que les projets doivent acquérir pour couvrir les risques au cours du développement.

  • Quel est la bonne chose à développer.

  • Combien le développement va coûter.

  • Si l'équipe est la bonne, comment ses membres peuvent travailler au mieux ensemble.

  • Où se trouve les imperfections techniques de leurs idées.

Pour permettre l'apprentissage au plus tôt, les activités doivent être inclues dans le plan du projet. Alistair décrit comment cela impact le plan:

"L'ancien" style, encore fréquemment utilisé, de planification de projet est une liste des tâches à accomplir pour développer le système. Une méthode efficace, rapide et peu coûteuse de planification est le type "Blitz Planning" AC-bp. Ce plan de projet conventionnel fournit toujours un bon point de départ, en permettant d'avoir un aperçu sur ce qui va être impliqué dans le développement du système et en estimant la taille approximative et la difficulté de l'effort à fournir.

Le plan de projet le plus récent, le style agile, est simplement une énumération des fonctionnalités ou des user stories intégrée dans une seule liste, généralement avec l'élément dont la valeur est prioritaire pour l'entreprise placé en haut de la liste (voir ci-dessus les raisons pour lesquelles ce n'est pas forcément le meilleur ordre de priorité).

L'approche d'acquisition des connaissances, à l'inverse, débute par un brainstorming à propos des quatres catégories de connaissances qui doivent être acquises, ainsi que l'ensemble de départ des fonctionnalités devant être livrées, ce qui fait cinq axes de travail possibles. Ils sont habilement reliés les un aux autres à travers une séquence de tâches visant à réduire les risques, fournir des informations cruciales, et développer le produit de façon optimale.

No comment yet.
Scooped by Mickael Ruau
September 9, 2020 5:42 AM
Scoop.it!

Fat Tony contre Dr. John: le défi de la rationalité en incertitude

Fat Tony contre Dr. John: le défi de la rationalité en incertitude | Devops for Growth | Scoop.it
Supposons qu’une pièce n’est pas truquée, c’est à dire qu’elle a une probabilité égale de tomber sur pile ou face lorsqu’elle est lancée. Je la lance 99 fois et tombe sur face à chaque fois. Quelle est la probabilité que j’obtienne pile au prochain lancement ?

Dr. John : question triviale. 50% bien-sûr puisque vous indiquez une probabilité égale pour chaque face et une indépendance entre les lancers.

Taleb: Fat Tony?

Fat Tony : Pas plus de 1%, bien-sûr.

Taleb : Pourquoi ? Je vous ai indiqué que la pièce n’est pas truquée, ce qui signifie une probabilité de 50% pour chaque face.

Fat Tony (dans son langage caractéristique) : Vous êtes plein de merde ou un parfait pigeon pour gober cette histoire de 50%. La pièce est de toute évidence truquée. Ça ne peut être un jeu honnête.
Mickael Ruau's insight:

 

Dr. John est fragile, c’est à dire qu’il est facilement victime de cygnes noirs, ces événements de faible probabilité et de fort impact. Tant que le cadre est solide, tant que l’extérieur n’influe pas sur l’intérieur, tant que les règles qu’on lui a données sont exactes, son approche ‘rationnelle’ est supérieure en termes de performance. Si le dé n’est pas pipé, bien évidemment qu’il reste 50% de chances de tomber sur pile. Autrement dit, si tout va bien, tout va bien. Mais le propre des cygnes noirs étant précisément de provenir hors du cadre, limiter sa pensée au cadre expose tôt ou tard à l’un d’entre eux.

Fat Tony, lui, est robuste. Il n’est pas vraiment capable de donner la probabilité de tirage du côté pile, mais il sait sans hésitation qu’elle est bien loin des 50%, et que la pièce est truquée malgré les assurances de quelqu’un d’honorable. Il n’a même pas besoin de savoir si Taleb lui ment, ou si Taleb se trompe. Il évite plus facilement les cygnes noirs. Notez qu’il ne trouve pas la réponse, il se ‘contente’ d’éviter d’en donner une mauvaise. C’est ce que Taleb appelle l’empirisme négatif.

No comment yet.
Scooped by Mickael Ruau
May 12, 2020 1:27 AM
Scoop.it!

Assumptions, Risks, and Dependencies in User Stories - DZone Agile

Assumptions, Risks, and Dependencies in User Stories - DZone Agile | Devops for Growth | Scoop.it
Assumptions, risks, and dependencies in your requirements and user stories might slip under the radar and harm your project success if left unchecked.
No comment yet.
Scooped by Mickael Ruau
April 24, 2020 1:00 AM
Scoop.it!

Blog: Agile & Risk Management: Antifragile | Innolution

Blog: Agile & Risk Management: Antifragile | Innolution | Devops for Growth | Scoop.it
Blog posting that introduces the concept of antifragility and relates it to agile development.
No comment yet.
Scooped by Mickael Ruau
December 30, 2019 4:45 AM
Scoop.it!

Predicting Your Future - Estimate with Confidence

Predicting Your Future - Estimate with Confidence | Devops for Growth | Scoop.it
All software teams are asked to predict the future; by providing project estimates. Learn how to predict the future with confidence.
No comment yet.
Scooped by Mickael Ruau
December 6, 2019 9:49 AM
Scoop.it!

Managing Risks with ROAM

Managing Risks with ROAM | Devops for Growth | Scoop.it
Importance of risks can not be emphasized enough. They can not only affect your Program Increment’s progress but can be a serious threat to your company’s repute, if not identified and mitigated properly. Risk management has become an essential part of any company’s planning method. In this article, we will
No comment yet.
Scooped by Mickael Ruau
November 20, 2019 9:49 AM
Scoop.it!

Pyramide des risques — Wikipédia

Pyramide des risques

La pyramide des risques est une représentation symbolique de la répartition statistique des situations à risques et des accidents. Les premières représentations de ce type ont été faites par Heinrich en 1931, puis par Bird en 1969. Ces deux représentations particulières sont connues sous les noms de pyramide des risques de Bird, et de pyramide des accidents de Heinrich.

Mickael Ruau's insight:

Cette représentation fournit tout d'abord un instrument de mesure : si les accidents graves sont rares, on peut attendre « longtemps » avant de s'apercevoir des problèmes de sécurité dans une organisation, et il est alors trop tard. On a donc une meilleure vue de la situation si l'on surveille les accidents bénins, les presqu'accidents et les situations dangereuses (même en absence d'événement inquiétant), c'est-à-dire les « signaux faibles ».

Cette représentation pyramidale justifie également la doctrine selon laquelle il n'y a pas de petits incidents, et que pour réduire la fréquence des accidents graves, il faut réduire le nombre de situations anormales même si elles n'ont pas de conséquence ; d'où l'adage : « c'est la fréquence qui fait l'accident ». Certains cindynistes mettent en garde contre une application sans discernement de cette doctrine8 : en effet, les accidents les plus graves sont souvent de nature différente des accidents bénins, et sont parfois le fait de personnes « bien notées », c'est-à-dire n'ayant pas au quotidien des attitudes à risque, et donc il ne faut pas se contenter de réduire le nombre d'incidents mais s'attaquer aux deux extrémités de la pyramide.

No comment yet.
Scooped by Mickael Ruau
November 14, 2019 10:43 AM
Scoop.it!

Modèle ROAM pour gérer les risques

La gestion des risques est essentielle lors du cycle de vie d'un produit voire d'une entreprise. Le modèle ROAM va vous aider à cela.
Mickael Ruau's insight:

 

Le modèle ROAM est un acronyme simple pour définir :

  • Resolved (résolu) : le risque a été intégralement pris en charge et est totalement écarté à présent
  • Owned (pris en charge) : une personne a pris en charge le risque afin de la résoudre intégralement ou partiellement
  • Accepted (accepté) : le risque est accepté par l’équipe qui en acceptera les éventuelles conséquences si le celui-ci devait arriver.
  • Mitigated (atténué) : le risque a été géré de façon partielle pour diminuer les conséquences potentielles de celui-ci si l’équipe devait le rencontrer.

En effet, cette matrice est très intéressante car elle permet d’amener l’idée qu’un risque peut être géré de façon partielle ; on diminue les conséquences du risque et/ou les chances de le rencontrer sans pour autant le gérer intégralement.

No comment yet.
Scooped by Mickael Ruau
November 8, 2019 2:44 AM
Scoop.it!

How to Calculate Cost of Delay To Know Where You Lose Money

How to Calculate Cost of Delay To Know Where You Lose Money | Devops for Growth | Scoop.it
Understand what is “cost of delay” and how it impacts your company and organisation. Learn how to calculate cost of delay and learn how much money you lose every time your team delays a project.
Mickael Ruau's insight:

4 Different Types of Cost of Delay

It’s also important to know the different types of Cost of Delay (CoD) as it will have an impact on your computations.

  • Fixed Date Curve: As the name implies, this relates to projects that have a fixed and stringent deadline. This means the CoD is connected to a specific time frame. For example, the project will be affected when a new law is implemented or when a TV advertisement is already scheduled to be launched internationally.

Computation of Cost of Delay in this instance is a bit more complicated. Initially, the CoD will grow at a moderate pace. However, the CoD will receive a major boost after a certain time period and will return to a minimal growth rate afterwards.

  • Intangible Curve: This pertains to projects with low Cost of Delay. These are usually the projects that have low priority because they have minimal impact. This also means that CoD is virtually static as there’s little or no risk if the project is delayed.
  • Standard Curve: The Cost of Delay of a project grows linearly with this type. This is the easiest CoD to compute as it does not change with the duration.
  • Urgent Curve: In this type, the project has to be finished and delivered quickly so it can generate value for the company. A delay will result in a huge loss. For instance, your competitor is gearing up for a major product launch and your company has a limited time to react and compete. The Cost of Delay of this type of project will be high from the beginning of the week of the deadline and will just rise over time.

It should be pointed out that the CoD curve of a project can change. For example, one company has released a product using a newly developed, groundbreaking software. Because the company has no competition, the CoD follows a standard curve.

 

However, the project team receives word after a year that a competing company is developing a product with the same features and it will be released in a specific month. The previous standard CoD curve will be replaced by the fixed date curve.

No comment yet.
Scooped by Mickael Ruau
November 7, 2019 6:06 AM
Scoop.it!

Risk Assessment, Economic Evaluation, and Decisions Workshop | Harvard Center for Risk Analysis | Harvard T.H. Chan School of Public Health

Risk Assessment, Economic Evaluation, and Decisions Workshop | Harvard Center for Risk Analysis | Harvard T.H. Chan School of Public Health | Devops for Growth | Scoop.it

The Risk Assessment, Economic Evaluation, and Decisions workshop includes presentation and discussion of a series of papers building on work by John S. Evans and designed to improve the integration of risk assessment and economic evaluation.

Mickael Ruau's insight:

 

  • Katherine von Stackelberg* and Pamela Williams.* Evolving Science and Practice of Risk Assessment (paper)
  • Jonathan Levy.* Incorporating Inequality into Risk Assessment and Benefit-Cost Analysis (paper)

 

  • Roger Cooke,* Deniz Marti, and Thomas Mazzuchi . Expert Judgment and the Inevitability of Validation (paper)
  • John Graham,* Jonathan Wiener,* and Lisa A. Robinson. Co-Benefits, Countervailing Risks, and Cost-Benefit Analysis (paper)

 

 

 

 

3:00-5:00: Successes and Failures of Risk Analysis: Lessons for the Future (chair, James K. Hammitt)

  • Adam Finkel* and George Gray.* The Pebble Remains in the Master’s Hand: Two Careers Spent Learning (Still) from John Evans (paper)
No comment yet.
Scooped by Mickael Ruau
November 30, 2021 10:39 AM
Scoop.it!

Plan de contingence : prévoir les risques de turbulences - CRHA

Plan de contingence : prévoir les risques de turbulences - CRHA | Devops for Growth | Scoop.it


Cet exercice de réflexion, de mise en situation et de préparation demande d’être mené en amont et non pas au cœur d’un crise. Évidemment, il est impossible de prévoir chacune des sources de crise ainsi que les situations possibles en découlant. Cependant, un plan de contingence permet d’avoir une longueur d’avance. Plus précisément, cela amène une rapidité d’action dès le départ ainsi qu’un état de contrôle chez les dirigeants qui se traduit par un sentiment de confiance auprès des équipes.
No comment yet.
Scooped by Mickael Ruau
October 26, 2021 1:17 AM
Scoop.it!

What Is a Barbell Strategy? Barbell Strategy Applied To Business

What Is a Barbell Strategy? Barbell Strategy Applied To Business | Devops for Growth | Scoop.it

A Barbell strategy consists of making sure that 90% of your capital is safe, and use the remaining 10%, or on risky investments. Applied to business strategy, this means having a binary approach. On the one hand, extremely conservative. On the other, extremely aggressive, thus creating a potent mix.

No comment yet.
Scooped by Mickael Ruau
July 12, 2021 8:52 AM
Scoop.it!

Budgeting and overseeing tech projects | De-risking government technology:State Software Budgeting Handbook | 18F

The De-risking Government Technology Project provides expert, actionable guidance to the public sector for delivering federally-funded, custom technology projects successfully.
Mickael Ruau's insight:
No comment yet.
Scooped by Mickael Ruau
June 16, 2021 8:16 AM
Scoop.it!

ISO 21500 — Wikipédia

ISO 21500 - Wikipédia

La norme internationale ISO 21500 intitulée " Lignes directrices sur le management de projet " définit un cadre de référence pour l'organisation, la planification et la conduite de projets. Elle se compose d'une définition de concepts clés autour de la notion de projet, et d'un ensemble de 39 processus couvrant tous les aspects du management d'un projet.

La norme ISO 21500 est très proche du référentiel « Project management Body of Knowledge » (PMBOK) du Project Management Institute (PMI). En effet, les deux référentiels utilisent les mêmes 5 groupes de processus et 10 groupes de sujets (appelés domaines de connaissances dans la terminologie du PMI), avec seulement quelques différences mineures dans l'appellation4. Les deux sont donc complémentaires5. Néanmoins ISO 21500 reste plus légère avec ses 39 pages à comparer au plus de 600 pages du PMBOK6. Ceci s'explique par le fait que le PMBOK comporte 47 processus, et décrit pour chaque processus des techniques et outils spécifiques ainsi le détail des entrées et sorties.

PRINCE2, la méthode promue par le gouvernement britannique, se positionne comme méthode mettant en œuvre des principes de gestion de projet avec des concepts compatibles avec ISO 21500, et se voit donc complémentaire avec ISO 21500 et PMBOK7.

Mickael Ruau's insight:

 

Autres normes

La norme internationale ISO 10006:2003, intitulée « Systèmes de management de la qualité - Lignes directrices pour le management de la qualité dans les projets »8, définit certains éléments du management de projet, mais sous l'angle de la gestion de qualité. Cette norme a également de fortes similarités avec le PMBOK mais utilise une terminologie française différente d'ISO 215009.

La norme internationale ISO 10007:2003, intitulée « Systèmes de management de la qualité - Lignes directrices pour la gestion de la configuration »10 définit de bonnes pratiques en matière de management de la configuration, qui peut contribuer de façon complémentaire aux processus de gestion du contenu du projet, notamment par la d'identification des livrables du projet et à la maitrise des modifications3.

La norme internationale ISO 21511:2018, intitulée « Management de projets, programmes et portefeuilles - Organigramme des Tâches en management de projet et de programme »11 complète la norme avec des lignes directrices et des pratiques reconnues pour l’élaboration et la création d’un organigramme des tâches du projet.

La norme internationale ISO 31000:2009, intitulée « Management du risque – Principes et lignes directrices »10 peut également contribuer à renforcer les processus liés à la gestion des risques du projet.

No comment yet.
Scooped by Mickael Ruau
May 13, 2020 1:02 AM
Scoop.it!

Agile and Risk Management: Mental Model of Uncertainty | Innolution

Agile and Risk Management: Mental Model of Uncertainty | Innolution | Devops for Growth | Scoop.it
Blog posting that introduces a mental model for dealing with uncertain events.
No comment yet.
Scooped by Mickael Ruau
May 5, 2020 2:03 AM
Scoop.it!

Blog: Allow for Uncertainty with Built-In Slack – The Flying Spare Example | Innolution

Blog: Allow for Uncertainty with Built-In Slack – The Flying Spare Example | Innolution | Devops for Growth | Scoop.it
Example of how FedEx uses hot spares or flying spares to provide slack to deal with uncertainty
No comment yet.
Scooped by Mickael Ruau
April 8, 2020 12:35 PM
Scoop.it!

RAID Analysis: Risks, Assumptions, Issues, Dependencies

RAID Analysis: Risks, Assumptions, Issues, Dependencies | Devops for Growth | Scoop.it
RAID- Risks, Assumption, Issues, and Dependencies.During Sprint or Release Planning it is useful to capture any Risks, Assumptions, Issues and Dependencies.
No comment yet.
Scooped by Mickael Ruau
December 6, 2019 9:50 AM
Scoop.it!

Le modèle ROAM de gestion des risques

Une fois les risques du projet identifiés, le modèle ROAM fournit une aide précieuse pour les classer en quatre groupes :

  • Resolved (résolu) : le risque est clairement identifié et une action peut être mise en place pour le contourner ou pour l’éliminer.
  • Owned (pris en charge) : un membre de l’équipe a accepté la responsabilité de traiter ce risque et de mettre en place un certain nombre d’action en ce sens.
  • Accepted (accepté) : le risque a été clairement identifié ainsi que ses conséquences potentielles. Néanmoins, l’ensemble de l’équipe est tombée d’accord pour ne pas le traiter et ne rien faire. Cela peut être le cas si le risque identifié semble tout à fait mineur et que même si un problème survient, il n’aura que peu d’impact sur le déroulement du projet.
  • Mitigated (atténué) : une action a été mise en place de façon à ce que la probabilité qu’un problème survienne soit grandement diminuée, et que dans ce cas, les conséquences soient minimisées.

L’estimation de chaque risque peut se faire au travers de deux critères, son impact sur le projet, et la probabilité qu’un problème survienne effectivement.

No comment yet.
Scooped by Mickael Ruau
November 27, 2019 2:12 AM
Scoop.it!

How to differenciate Bugs, Software Risks and Software Failures - Part 2 - Software in Medical Devices, by MD101 Consulting

How to differenciate Bugs, Software Risks and Software Failures - Part 2 - Software in Medical Devices, by MD101 Consulting | Devops for Growth | Scoop.it
In my previous post about Bugs, Software Risks and Software Failures, I explained the concepts of bugs, defects or anomalies, and the concept of software failure. Let's continue
No comment yet.
Scooped by Mickael Ruau
November 15, 2019 2:51 AM
Scoop.it!

Wardley maps explained & canvassed on a virtual whiteboard

Wardley maps explained & canvassed on a virtual whiteboard | Devops for Growth | Scoop.it
Wardley Maps are all about strategy. This is especially helpful if you are starting a business or a non-profit, inspecting the competition, analyzing opportunities or even trying to anticipate what the future might hold. Here's how you build a Wardley Map and collaborate with your team using a virtual whiteboard.
No comment yet.
Scooped by Mickael Ruau
November 8, 2019 4:45 AM
Scoop.it!

Agile strategies for managing bug fixes

Agile strategies for managing bug fixes | Devops for Growth | Scoop.it
On agile projects, quality comes through collaboration.
Mickael Ruau's insight:

Although some Agile teams prefer to deal with bugs in a separate backlog, teams practicing Scrum generally find that it's cheaper and more efficient to handle bugs in the product backlog itself. Dealing with bugs on the product backlog can often be done effectively via "Three Amigos" meetings, which involve a product owner (or a business analyst), a developer and a QA tester who get together (either face-to-face or on-line) to review the bug, the tests used to detect it, and any other dependencies.

No comment yet.
Scooped by Mickael Ruau
November 7, 2019 8:09 AM
Scoop.it!

Prioriser par coût du retard (cost of delay)

Prioriser par coût du retard (cost of delay) | Devops for Growth | Scoop.it
Le coût du retard est un concept très puissant afin d’aider à la priorisation d’un élément de travail en Kanban.  Cet outil ne remplace pas les techniques de coût d’opportunités utilisées en finance, mais peut servir de guide dans la prestation de travail de notre équipe/service. 4 cas de figures (Extrait du Essential Kanban Condensed)…
No comment yet.