On 27 September 2024, Bids for the Silo Dr and Tara Blvd crosswalk safety upgrades were received. For more information about these projects, see Tara Blvd Crosswalk Improvement Timeline and North Sycamore Street Pedestrian Safety Timeline.]
On 27 September 2024, bids for for two pedestrian crosswalks safety upgrades were and read aloud at the offices of Remington and Vernick Engineers at 1010 Stony Hill Road, Suite 175, Yardley, PA 19067. For more about these projects, see the Tara Blvd Crosswalk Improvement Timeline and the North Sycamore Street Pedestrian Safety Timeline.
The township received a total of two (2) bids as follows:
- T. Schiefer Contractors, Inc.
- Base Bid - $391,915.00
- Alternate Bid No. 1 (decorative poles) - $117,000
- Armour & Sons Electric, Inc.
- Base Bid - $437,445.00
- Alternate Bid No. 1 (decorative poles) - $103,125
The Township engineers have started to review all the submitted documentation and will have a recommendation for award as soon as possible. The bids do need to be submitted to Automated Red Light Enforcement (ARLE) Funding for their review and approval as part of the grant contract. Note that the township received an ARLE Grant of $326,931 for these projects. An additional $50,000 is available from another grant.
Update: Meanwhile, the back and forth with PennDOT regarding Silo Dr ADA ramps is holding up the issuance of the permit for the Silo Dr crosswalk pedestrian safety improvements, which is turn is holding up the Tara Blvd crosswalk improvements. For more on that, read
“#NewtownPA's Problematic Diagonal ADA Curb Ramps”; https://sco.lt/8kJGoy